Skip to main content

Local Law 11 Inspection

Inspection

FISP Report Review in NYC That Turns Ratings Into a Plan

A FISP report review takes the technical report your QEWI filed and works through it line by line. We explain every Safe, SWARMP and Unsafe item, gather the dates that apply and turn the findings into a priced repair list. Ratings stay with the licensed inspector who signed the report, and nothing in a review changes what the QEWI found.

Two people reviewing building drawings and paperwork on a desk, the way a FISP technical report is gone through line by line

When Owners Ask for a FISP Report Review in NYC

Boards Facing a SWARMP List

Co-ops and condos deciding which repairs to fund first and how to explain them to shareholders.

Owners With an Unsafe Filing

Buildings under a shed that need the 90-day clock, extension forms and repair path laid out clearly.

Buyers and New Managers

People taking over a building who inherit a report written for someone else.

What Safe, SWARMP and Unsafe Mean on a FISP Report

Every FISP technical report classifies each facade condition, and the building carries the status of its worst item. Safe means nothing found needs repair to keep the wall sound through the cycle. SWARMP is DOB’s shorthand for a condition that is safe today but needs a repair and maintenance program, and the QEWI writes a completion date into the report no sooner than one year and no later than five years out. Unsafe covers anything that needs repair within a year, and it calls for public protection right away.

Each rating starts its own clock. An Unsafe condition gets 90 days from the filing date for its correction, and FISP1 and FISP2 extension requests keep the building covered every 90 days if the work runs longer. Protection stays up until an amended report showing Safe or SWARMP is accepted. A SWARMP item left open, or one needing repair in back-to-back cycles, moves up to Unsafe in the next report. Owners can follow each filing on their DOB NOW Safety dashboard, which is also where they sign the owner’s statement.

Everything We Go Through in Your Technical Report

A review leaves you knowing what each line means and what to do about it.

From Uploaded Report to a Signed Repair Plan

01

Report Received

Send the filed PDF and any earlier reports for the building.

02

Items Mapped

Every condition is listed with its rating, location and due date.

03

Walk-Through Call

We go over the findings with you or your board and answer each question.

04

Repairs Lined Up

Our crews price the work and schedule it ahead of every deadline.

Anatomy of a FISP Technical Report

Past the rating page, a technical report holds five parts owners often skip. The sample sheet below is a drawing made for this page, not a real filing.

Anatomy of a FISP technical reportIllustrated inside pages of a NYC facade inspection technical report with five numbered parts, the filing details, the close-up record with drop lines and probe notes, the prior cycle follow-up table, the water-tightness notes and the maintenance plan. A drawing made for this page, not a real filing.TECHNICAL REPORT, INSIDE PAGESSample drawing for illustration only. Not a real filing.1FILING DETAILSBuilding IDSub-cycleFiling dateQEWI license2CLOSE-UP RECORDD1D2D3Dated close-up photoProbe P1Tie spacingRelieving angleSubstrate3PRIOR CYCLE FOLLOW-UPItemLast reportThis reportWindow lintel, front wallSWARMPREPAIREDCoping stones, roof edgeSWARMPUNSAFEBalcony slab edgeSAFESWARMP4WATER-TIGHTNESS NOTES5MAINTENANCE PLANRenew window sealantClear roof drainsRecheck coping joints
  • Filing Details

    Building ID number, sub-cycle, filing date and the QEWI's name and license, which together set every deadline that follows.

  • Close-Up Record

    Where each drop or platform reached the wall, with a dated photo of the inspector at work and any cavity wall probe results.

  • Prior Cycle Follow-Up

    What became of each item from the last report, whether repaired, still open or now rated higher.

  • Water-Tightness Notes

    How well the walls, joints and openings keep water out, which often explains why a defect keeps coming back.

  • Maintenance Plan

    The upkeep the QEWI advises between cycles, such as renewing sealant or clearing roof drains, so Safe items stay that way.

Where the QEWI's Job Ends and Ours Begins

Your QEWI

Our Team

What to Send for a FISP Report Review

Five items give the clearest picture of where your facade stands.

The Filed Report

The full PDF, including photos, drawings and any appendix.

Earlier Cycle Reports

The last one or two filings, so carried-over items stand out.

DOB NOW Status

The status line from your dashboard, so the dates can be confirmed.

Repair Records

Invoices and permits for work done since the filing.

Your Own Deadlines

Board meetings, refinancing or a sale that shapes the repair schedule.

Got a FISP report full of dates and codes you are unsure about? Send the PDF through the contact page for a plain-language summary of what it asks of you.

Pricing a FISP Report Review, Factor by Factor in NYC

Factor How It Affects Cost

Report Length

Reports with many elevations and conditions take longer to read and map.

Number of Unsafe Items

Each Unsafe item adds deadline and extension tracking.

Prior Reports to Compare

Comparing two or three cycles takes more time than reading a single report.

Site Check

A visit to confirm conditions from the roof or street adds to a desk review.

Deliverables

A spoken walk-through costs less than a written board brief with a priced repair scope.

Close view of a brown and red masonry facade, the kind of wall detail described in a FISP report

Answers for Owners Reading a FISP Report

No. Only the QEWI who signed the report can classify conditions, and any change comes through an amended or subsequent filing in DOB NOW. A review explains the ratings and plans the repairs around them.

The building status follows its most serious condition. One Unsafe item sets the status even when every other line on the report is Safe or SWARMP.

Yes, and it is often cheaper to do it while the damage is small. The QEWI records the correction, and the item no longer counts against the building in the next cycle.

The QEWI files a FISP1 request for more time, then FISP2 requests every 90 days after that. A gap between requests brings penalties for the uncovered period, and time cannot run past the Unsafe completion date without a subsequent report.

Owners and their representatives can see every facade filing for the building on the DOB NOW Safety dashboard, and the QEWI who filed it can send the full PDF.

Yes. After reviewing the filing, the owner signs the owner's statement electronically in DOB NOW, while the QEWI signs the applicant statement.

Only after the amended report from your QEWI, showing Safe or SWARMP, is accepted by DOB. Where only part of the facade is finished, a partial shed removal request can free those areas sooner.

Yes. A SWARMP condition that needed fixing in consecutive cycles is reclassified as Unsafe, and DOB expects repairs to fix the cause rather than just the surface.

Next, Turn the Findings Into Finished Repairs

SWARMP and Unsafe items move from the report to finished work with our licensed and insured crews, and the records go straight to your QEWI.